Galvas Construction finally put up his job site sign and the dumpster and port-o-potty were delivered!
That's OUR wood, in case you couldn't tell.
The architect inspecting the placement of the slab form work set by the concrete and framing subcontractor, Santos Martinez. Viewed from street/front of house.
Jonathan is standing on the wood pilings, the height at which the front porch will sit.
Slab form work, viewed from front corner of the garage.
Slab form work, viewed from the entrance to the garage.
Slab form work, viewed from the entrance to the motorcycle/bike garage door.
Standing in the garage, looking (through a future wall) over into the Dog Room. Yes, there will be a room just for the dogs. There will be a door that leads out into the back yard (toward the top right of the picture).
View of wood pilings where the front porch will sit, viewed from street.
Again, the porch will be at the height of that 2x12 that is resting on top of the pilings.
Jonathan standing on the future front porch.
Pilings at front of house (front porch level).
Location of the Dog Room and storage space to the left on the slab.
Oh, that's me! Standing in the garage, while Jonathan shoots the picture from atop the pilings at the front porch. The main living/dining area and master bedroom level will be ANOTHER level higher than this! It's gonna be a killer view! Can't wait to see it.
That's all for today, slab will be poured Tuesday (hopefully), after they've laid the steel mesh and rebar.
No comments:
Post a Comment