Santos and crew are really moving "UP"!!! Framing of second and third levels continued on Saturday. These pictures were taken on Sunday 3/9/2014.
View of Jonathan's work room in the garage, looking out into back yard.
View of the motorcycle/bicycle closet on the left and through the walls of the garage, out into the front porch.
Garage.
View of mud room closet on bottom floor, off the garage.
Bay view out Master Bedroom window, on the 3rd level of the house.
Looking into Master Bath and part of Master closet on left.
Looking out windows of dining room.
Looking down into space where the stair well will eventually run. The room below is the entry/foyer. The very top of the picture is where the front porch sits.
Looking down the hallway on the main living floor (master bedroom behind camera) and the living room is to the right of Jonathan. Dining room is the framed area in center of picture.
The entire area below is where the living room and kitchen will be framed.
Look out windows of dining room. Nice view to enjoy some morning coffee, am I right?!?!
This is the view out the windows of the dining room!
Standing in the living room/kitchen, looking across to entrance to the master bedroom. That empty space in the middle of the picture is where the stairwell will be built.
Oh my gosh!!! I'm sorry, I'm a bad sister. I must admit this is the first time I've looked at your blog since you first created it. I had no idea you had built so much already!!!! Wowzers! It's going up fast!
ReplyDeleteYou're our FIRST COMMENT!! Congratulations!
DeleteThis comment has been removed by the author.
ReplyDelete