Tuesday, September 16, 2014

Countertop Install - 9/16/2014

Island in kitchen - quartzite waterfall!


Sink is installed in the island.


Countertop in laundry room, machines will go below counter, shelves will be installed above.

Laundry room counter, close up.

Bar area.  Ice maker will go to the left of the cabinets, wine fridge to the right.  Shelves will be installed on the wall to the right of the window.


Close up of the quartzite counter in the bar.  Same stone as the kitchen island.

Master bathroom counter installed!



wood panel wall in master bathroom was installed.  door leads into toilet room.

The top drawers on the far left and right are going to be replaced with working drawers.  For some reason the cabinet company didn't make those drawers functioning...?

Master closet!!  That's Amanda's closet section, shoes shelves all along the bottom of the hanging sections, four shoe shelves in that cabinet on the left, with shelves for sweaters or whatever above.

Tall hanging on left, two rows of short hanging in the middle, Jonathan's shelves on the right.

 Jonathan's closet section.

Amanda's shelves for shoes and clothes.

Tall hanging goes all the way to the wall, creating a little cubby for boots or whatever.

Lots of pictures of the closet, I'm totally obsessed.

Spare bathroom counter installed.

Second spare bedroom counter installed.

Guest bathroom/powder bath counter installed.  The sink is a pedestal sink, so they'll cut a hole in the center to set the sink.