Interior trim was installed over the weekend! Not complete, but Galvas had 9 trim carpenters nailin' away on Saturday and they made some major headway.
Wasn't sure if this wall had been paneled, so I took another picture of it.
Wood floors are down in the living room, dining room and kitchen!
Standing in dining room, looking into living room.
Standing in dining room, looking into kitchen on left, living room on right. Wood floors are all down.
Wood floors are all installed, trim is almost complete as well.
Doorways in 1st spare bedroom.
Doorway going into 2nd spare bedroom, on top floor.
Bathroom doorway in 2nd spare bedroom.
Master bedroom doors and windows are trimmed out.
Master closet - closeup of the trim work.
Master shower floor was installed.
Marble pebbles. Love the texture.
A calacatta marble slab will be placed in a few weeks for the bench in the master shower.