Thursday, October 9, 2014

Construction of Fireplace Mantel | Install of Various Fixtures - 10/8/2014

More progress on the house.  Light fixture in the wet bar was installed:


Vali Lazar and his guys came down from Atlanta to construct the fireplace mantel.  This picture was taken on October 7th while they were forming the mantel.


This picture was taken on October 8th after they had finished the mantel.


Kitchen sink faucet was installed.


Microwave and the "appliance cubby" cabinet were installed - appliance cubby is directly beneath the microwave.

Slim cabinet between the washer/dryer was installed.

Jonathan and I marked where we wanted all of the bath fixtures and rods installed on October 7th and they were installed on the 8th.

Master bath faucets installed.

Master bath towel rod installed. Master bath shower fittings installed.

Shower shelf installed.


Doors added to cabinet in closet.

Carpet was installed in the 2 spare bedrooms.  Love it, such a pretty light grey color.

Rest of the stair parts in the stair case to the top floor were installed.


Playroom on top floor, carpet installed.