Monday, October 6, 2014

Finishing Floors | Stair Parts Install | Appliance Install - 10/6/2014

Iron stair railings were installed today!

Front entry light fixture was hung.  It's still wrapped in plastic.

Iron stair rail from bottom floor, up to entry level.

Entry level.

Main living floor level.







Fan fixture was installed; fireplace hearth was installed; countertops above built-ins were installed.


dining room.

Countertops above living room built-ins

Appliances were installed!


Herringbone tile backsplash was installed.

Glass countertops installed.

Herringbone backsplash, hood, range all installed.


Dishwasher

Fridge.

Laundry machines.

Interior door hardware installed.

Master bedroom - fan installed.

Master bath.

Master bath toilet installed.

Entry level hall closet

Guest bedroom is painted, with fan installed.

craft room light installed.

Stair railing on top floor stairwell.

Top floor spare bedroom - light fixture and sink fittings installed.

Top floor spare bedroom - shower fittings installed.

No comments:

Post a Comment